Project: Island Circle

Before
After

    Like many existing waterfront homes we have constructed this home not only had 5 foot side yards to contend with it had an existing beautifully landscaped waterfront area we wanted to protect during construction.

    We began also by building a temporary construction wall across the site between the existing home and new construction then removed the old home, all footings and utilities and started fresh.

    We surveyed the set backs, trenched in new footings and framed from the front of the house back towards the street. We built his house on schedule, within budget and to the complete satisfaction of the owner.

Building Process


Excavating
New Foundation

The House Takes Shape

Framing Continues

Foundation Walls

Looking from
the Neighbor's Yard

Great Entrance

Interior


Foyer and Staicase

Master Bedroom

Master Bath

Master Bed Room
Sitting Area



Lakeside Patio

Kitchen